Lab power and UPS planner

I = S / V, S = P / PF

Use Quick for Ohm's law, Lab plan for a list of instruments from their nameplates, and UPS for the instruments you want to keep running. This is a planning estimate, not an electrical design.

Ohm's law & power

V
A
Ω
W

Enter exactly two positive values. The other two are calculated.

DC or resistive AC only. For AC equipment planning, use nameplate W, VA or A in Lab plan.

Calculated values

Enter exactly two positive values. The other two are calculated.

About this calculation

Runs in your browser

The calculation runs in your browser. Your inputs are kept in this browser's storage on this device so they are still here when you come back; Clear removes them.

Checked

Checked against: Ohm's law from each pair of values, a hand-worked single-phase and three-phase plan with power factor and reserve, the phase balancing, the protection rating and a UPS and battery estimate.

Calculation version 088929cdc6c2, shared with the Android app.

Worked example

Quick: 12 V and 2 A give R = 12 / 2 = 6 Ω and P = 12 × 2 = 24 W.

Lab plan, single phase, 230 V, 25 % reserve: an HPLC system of 600 VA at a power factor of 0.95 and a 1500 W water bath.

HPLC: 570 W, 2.61 A; water bath: 1500 VA, 6.52 A; total 2070 W / 2100 VA, 9.13 A; with 25 % reserve 11.41 A → protection candidate 13 A

UPS for the HPLC alone, 30 minutes, 25 % headroom, 90 % efficiency, 20 % battery reserve: at least 712.5 W and 750 VA, and about 396 Wh of battery. The Load example button fills in these values.

Formula

  • V = I · R and P = V · I (Quick, from any two values)
  • Power factor PF = P / S, with P in W and S in VA
  • Single phase: I = S / V. Three phase: I = S / (√3 · Vline)
  • Design current = highest phase current × (1 + reserve)
  • UPS: W and VA × (1 + headroom); battery = power × runtime ÷ efficiency ÷ (1 − battery reserve)

Phase spread is (highest − lowest phase current) ÷ average. In a three-phase laboratory, Auto places each single-phase unit on the phase that is least loaded at that point, largest units first; a three-phase instrument is spread equally over the three phases.

Assumptions and limits

  • Planning estimate only. Final circuits, cable size, protection type/rating, RCD, selectivity and phase connection must be approved from manufacturer site-preparation data and local rules by a qualified electrical professional.
  • DC or resistive AC only. For AC equipment planning, use nameplate W, VA or A in Lab plan.
  • Use the power factor of the nameplate or data sheet. If it is not given, 1.00 is an optimistic resistive-load assumption: motors, pumps, compressors and some power supplies are often lower. A lower power factor does not change the watts, but it raises the VA and the current. A value below 0.5 is flagged.
  • The protection candidate is only the next common rating (6, 10, 13, 16, 20, 25, 32, 40, 50, 63, 80, 100 or 125 A) above the design current. It is not a circuit design: the cable, its length, the ambient temperature, the installation method, the fault current, the inrush, the breaker curve, an RCD and the local regulations all change the final choice.
  • The circuit limit (32 A) and the supply limit (63 A) of a single-phase supply are starting assumptions for warnings: enter the limits of your site.
  • Battery Wh is an engineering estimate. Verify runtime on the selected UPS manufacturer's load/runtime curve and check inrush, crest factor and battery ageing.
  • The UPS headroom is applied to the W and VA rating only; the battery is sized to the connected load. Choose a unit that satisfies both the W and the VA result.

References

Ohm's law, the power relations and the three-phase current are textbook relations and use no tabulated data. The reserve, headroom, efficiency and battery reserve are planning assumptions that you set.

The calculation is the one used by the Lab Power & UPS calculator in the LabTools Android app, where PDF, Excel and CSV export and the longer explanation of each note are part of PRO.